How clinker substitution cuts the CO₂ from cement

Most of the direct CO₂ associated with cement comes from making clinker. Replacing a portion of that clinker with materials such as slag cement is one of the measures already in use.

· 5 min read · The ZAG Group

Portland cement is produced by grinding clinker with a small amount of gypsum and, in some cases, other constituents. Clinker itself is made in a kiln, where limestone is calcined — a chemical reaction that releases CO₂ — and fuel is burned to reach the required temperature.

The International Energy Agency has described that calcination step as inherent to conventional clinker production, and as constituting around two-thirds of the cement sector's direct CO₂ emissions. In a 2020 analysis the IEA also estimated that, on 2019 data, the steel and cement sectors each generated around 7% of total energy-system CO₂ emissions, including industrial process emissions. Those are IEA figures from that analysis, not a current ZAG estimate.

Because so much of the footprint sits in the clinker, using less clinker per tonne of cementitious material is a direct way to cut that footprint. Supplementary cementitious materials such as slag cement — ground granulated blast-furnace slag — and coal-combustion ash can replace a portion of portland cement or clinker in a blend or in a mix. The IEA's work on heavy industry treats this kind of substitution as one of the measures already available, while noting that deeper cuts still depend on other options, including changes to production processes.

The 772 kg CO₂e figure cited on this site illustrates the difference per tonne when slag cement is used in place of portland cement, based on the PCA and SCA industry-average EPDs already described. It should not be scaled into a claim about a particular project, or about a tonne of concrete.

How much clinker or portland cement is replaced in a given case remains a specification decision. The Slag Cement Association describes a typical range of 20–80% of cementitious material by weight for slag cement. That is a typical range, not a guarantee.

Sources

  1. International Energy Agency, “The challenge of reaching zero emissions in heavy industry,” 19 September 2020
  2. International Energy Agency, Cement (energy system / industry topic page)
  3. Portland Cement Association, Industry Average EPD for Portland Cement (EPD 195), 919 kg CO₂e per metric tonne, cradle-to-gate (A1–A3)
  4. Slag Cement Association, Industry Average EPD for Slag Cement, 2021, 147.0 kg CO₂e per metric tonne, cradle-to-gate (A1–A3)
  5. Slag Cement Association, FAQs, typical replacement of 20–80% of cementitious material by weight

Need supply for your facility?

Request supply

Sustainability6 min

What slag cement is, and what 772 kg CO₂e means

Ground granulated blast-furnace slag is a cementitious material. Compared with portland cement, two industry-average EPDs give a calculated difference of 772 kg CO₂e per tonne.

Need a reliable supply partner?

Tell us the material, volume and destination. We'll come back with options.

Request supply