
U.S. slag cement shipments reached a new high in 2025
The Slag Cement Association reported more than 4 million metric tonnes shipped in 2025. Industry-average EPDs remain a useful way to describe the carbon difference versus portland cement.
· 4 min read · The ZAG Group
On 12 May 2026, the Slag Cement Association reported that U.S. slag cement shipments reached a historic high of more than 4 million metric tonnes in 2025. The association also said shipments of blended cements containing slag increased 18 percent in 2025, and that this series has grown at a compound annual rate of nearly 6 percent since 2020.
Those figures describe one material used to cut the CO₂ footprint of the built environment, not the whole supplementary category. Slag cement — ground granulated blast-furnace slag — is used to cut that footprint. It sits alongside other materials used for the same purpose, including coal-combustion products and portland-limestone cement. A single-material record is not the same thing as a complete picture of U.S. blended cement, but it is a clear official data point.
The carbon comparison that can be made carefully is the one already used on The ZAG Group site, from industry-average environmental product declarations. The Portland Cement Association's industry-average EPD for portland cement (2021, revised 2023) declares a cradle-to-gate (A1–A3) global warming potential of 919 kilograms of CO₂e per metric tonne. The Slag Cement Association's industry-average EPD for slag cement (2021) declares 147.0 kilograms of CO₂e per metric tonne on the same basis. The difference is 772 kilograms of CO₂e per metric tonne. That is a difference between two declared-unit averages, not a project-specific saving, and it is not a percentage claim.
On use rates, the Slag Cement Association's published FAQs describe a typical replacement share of 20–80 percent of cementitious material by weight. That is a typical range, not a guarantee for any one facility or mix.
The May 2026 release also offers the association's own view of demand, including work on large digital-infrastructure projects. That is SCA's commentary, not a ZAG claim, and it does not identify any ZAG customer. What the shipment numbers themselves show is simpler: more slag cement moved in the United States in 2025 than in previous years, and blended cements that contain slag also increased.
The ZAG Group supplies cement materials across a broader range than slag cement alone. The value of the SCA release is that it puts an official, dated figure on one part of the shift toward materials that cut the CO₂ footprint of the built environment.
Sources
- Slag Cement Association, “Slag Cement Association Announces Record-Breaking Shipments in 2025,” news release dated 12 May 2026
- Slag Cement Association, Industry Average EPD for Slag Cement, 2021 (147.0 kg CO₂e per metric tonne, cradle-to-gate, A1–A3)
- Portland Cement Association, Industry Average EPD for Portland Cement, 2021, revised 2023 (919 kg CO₂e per metric tonne, cradle-to-gate, A1–A3). The 772 kg CO₂e figure is the difference between those two declared-unit GWPs, as already stated on The ZAG Group site.
- Slag Cement Association, FAQs, for the 20–80 percent typical replacement share of cementitious material by weight
Need supply for your facility?
Request supply